Install smoke barrier doors that can resist smoke for at least 20 minutes.
Severity E of L: no actual harm, potential for more than minimal harm, patternCorrected Aug 27, 2021
Inspect, test, and maintain automatic sprinkler systems.
Severity E of L: no actual harm, potential for more than minimal harm, patternCorrected Aug 27, 2021
Ensure smoke barriers are constructed to a 1 hour fire resistance rating.
Severity E of L: no actual harm, potential for more than minimal harm, patternCorrected Aug 27, 2021
Have properly installed electrical wiring and gas equipment.
Severity E of L: no actual harm, potential for more than minimal harm, patternCorrected Aug 27, 2021
Properly install and monitor supervisory attachments on automatic sprinkler systems.
Severity D of L: no actual harm, potential for more than minimal harm, isolatedCorrected Aug 27, 2021
Meet other general requirements.
Severity D of L: no actual harm, potential for more than minimal harm, isolatedCorrected Aug 27, 2021
Have stairways and smokeproof enclosures used as exits that meet safety requirements.
Severity D of L: no actual harm, potential for more than minimal harm, isolatedCorrected Aug 27, 2021
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.
Severity D of L: no actual harm, potential for more than minimal harm, isolatedCorrected Aug 27, 2021
Enure that solid fuel-burning fireplaces are not in patient sleeping areas.
Severity D of L: no actual harm, potential for more than minimal harm, isolatedCorrected Aug 27, 2021
Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited.